• HOME
  • Author: info@msoft.af
  • Page 2
1

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
February 11, 2026

Naryal Restaurant

Naryal Restaurant Location: Afghanistan, Kabul, District 8, Karte-now, Sarak Awal Capacity:  80KW Client: Commercial  
Takwin Solar

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
February 11, 2026

Takwin Solar

Takwin Solar Location: Afghanistan, Kabul, District 3, Karte-Seh, Pol Wahdat Beside of Hamam Sari Ghazni Capacity:  100KW Client: Commercial  
Location

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
February 11, 2026

Water Emergency Relief Project ( WERP) Nangarhar Province

Water Emergency Relief Project ( WERP) Solar Water Pump Project Location: Nangarhar Province Capacity:  170KW Client: UNOPS  
Supply, Installations, ITB-003-22 UNDP Procurement Configuration

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
January 20, 2026

Supply and Assembly Solar System to 250 House Holds in Door baba

Supply and Assembly Solar System to 250 House Holds in Door baba District of Nangarhar Province Location: Door baba District of Nangarhar Province Capacity:  150KW Client: UNDP  
1

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
January 18, 2026

Supply, Installations, ITB-003-22 UNDP Procurement Configuration

Supply, installations, ITB-003-22 UNDP Procurement configuration, testing, commissioning of Solar photovoltaic Electrical Systems for the solarization of 60 selected Small and Medium Enterprises SMEs in Afghanistan Location:  Jalalabad, Mazar Sharif, Kunduz, Badakhshan, Takhar- Afghanistan Capacity:  560KW Client: UNDP    
12

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
January 18, 2026

Design, Supply, Installation, and Commissioning of the Laghman Project Site, including detailed planning, provision of materials and equipment, system installation, testing, and final commissioning to ensure efficient operation within the designated project area.

Design, Supply, Installation, and Commissioning of the Laghman Project Site, including detailed planning, provision of materials and equipment, system installation, testing, and final commissioning to ensure efficient operation within the designated project area. Project Client: UNOPSBudget:  $1,200,000.00
01

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
January 18, 2026

Opening ceremony of Laghman’s 40 MW solar power plant with an integrated 10 MW battery storage system. Executives from Regal Group launches the laghman’s largest solar project.

40 MW Solar Plant with 10 MW Battery Backup System in Herat, Guzara,Industrail Park Project Customer:  DABSAmount:  $32,000,000.00 INAUGURAL of 40 MW Solar Plant with 10 MW Battery Backup System in Herat Guzara Industrial Park the PPA Agreement signed with the Budget of USD 32 Million Dollar
8

Warning: Undefined variable $archive_category in /home/regalgroup/public_html/wp-content/themes/aimo/inc/classes/class-blog.php on line 12
January 18, 2026

Engineering, Supply, Installation & Commissioning of 126 MVA

Engineering, Supply, Installation & Commissioning of 126 MVA Substation in Logar, Mohammad Agha ,Industrail Park Project Customer:  DABSAmount:  $ 10 Million Dollar

Recent Comments

No comments to show.